Customization: | Available |
---|---|
Function: | Steam Boilers |
Fuel: | Gas-Fired |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Modle:DRS-GH10-108(144)KW
Heat Output Power (kW):108(144)
Water Output at a 50°C Temperature Rise (T):1.8(2.5)
Heating Area (m²):500-1400
Outlet water temperature (ºC):<95
Inlet Water Temperature (ºC)>0
Hot Water Outlet Pipe Diameter (DN mm):32
Hot Water Inlet Pipe Diameter (DN mm):32
Sewage discharge pipe diameter (DN mm):32
Hot Water Circulation Pump:20M/4T/H-1.1kw
1.6 MPa Plate Heat Exchanger (m²):5
Power Supply Cable Diameter (mm²):90(110)
Maximum Power Consumption (kW):108(144)
Minimum Power Consumption (kW):36
Maximum Current (A):280(380)
Total Input Electrical Power (kW):112(148)
Starting Method:Multi-stage frequency conversion with adjustable soft start in increments from 3 to 120 seconds
Stopping Method:Multi-stage frequency conversion with adjustable soft stop in decrements from 3 to 120 seconds
Multi-group power adjustment with each group independently controlled:27-144kw
Overall dimensions (length × width × height in cm):100*80*110
Product basic information of the same series:
Product model | DRS-GH10-216KW | DRS-GH10-288KW | DRS-GH10-360KW |
Heat output power(kcal) | 185000 | 248000 | 310000 |
Heat Output Power (kW) | 216 | 288 | 360 |
Water Output at a 50°C Temperature Rise (T) | 3.7 | 5 | 6.2 |
Heating Area (m²) | 1000-1850 | 1400-2800 | 1800-3600 |
Water Tank Capacity (kg) | 450 | 550 | 650 |
Power Supply Cable Diameter (mm²) | 160m² | 200m² | 250m² |
Maximum power consumption(kw) | 216 | 288 | 360 |
Minimum power consumption(kw) | 36 | 36 | 36 |
Maximum current(A) | 560 | 750 | 950 |
Voltage (v) | 380 | 380 | 380 |
Total Input Electrical Power (kW) | 221 | 293 | 366 |
Total Machine Weight (kg) | 450 | 600 | 800 |
Overall dimensions (length × width × height in cm) |
120*90*130 | 140*120*130 | 160*120*140 |
1: We proudly stand as a distinguished manufacturer, not just a middleman trader, ensuring authenticity and reliability in every product.
2: Experience the flexibility of bespoke engineering as our boilers can be tailored to your specific requirements, ensuring perfect alignment with your needs.
3: Enjoy the benefits of direct factory pricing, free from hidden fees or additional charges, offering you unparalleled value and transparency.
4: We warmly invite you to explore our facilities at your convenience, where you can witness our operations and commitment to excellence firsthand.
5: From the moment you arrive in China, our dedicated team will guide you every step of the way, providing seamless assistance and resolving any queries or issues related to our boilers.
1: What is your main product?
Our flagship offerings include the cutting-edge Biomass Steam Generator and the high-efficiency Biomass Water Heater, representing the pinnacle of innovation in our product line.
Discover the power of our advanced Electric Steam Generator and Electric Water Heater, meticulously engineered to fulfill your industrial needs with unparalleled efficiency.
We offer superior Gas Oil Steam Generators and Gas Oil Water Heaters, providing efficient energy solutions to enhance your operations.
Our diverse range includes sturdy Hot Air Boilers and essential Boiler Accessories, delivering complete and reliable heating solutions for your enterprise.
2: How to obtain a detailed and precise offer?
To receive a detailed and accurate offer, please share your specific requirements, including steam capacity, working pressure, steam temperature, and fuel type. Our expert after-sales engineer will swiftly deliver a comprehensive proposal tailored precisely to your needs.
3: What services do you offer?
We offer an extensive suite of services, encompassing installation, repair, and maintenance services globally. Moreover, we provide 24/7 online guidance, ensuring support whenever you need it. Our dependable before-sale, in-sale, and after-sale services guarantee your satisfaction at every step.
4:When will the order be shipped?
Anticipate shipment within a timeframe of 15-45 days, assuring timely delivery aligned with your schedule.
5: Can you help us with installation and operational training?
Certainly, our company offers comprehensive drawings and a detailed operation manual to assist you. Should you need further support, please do not hesitate to contact us. Our skilled engineer will provide technical assistance online to facilitate your installation and operational training.